Restoration of Leeson Street Kiosk
Complete restoration of the external façade of Kiosk on Leeson Street Bridge
Client: Dublin City Council
Repair of all of the remaining fabric and reinstatement of lost features of this iconic building on Leeson Street.
Cleaned all brick and masonry features using DOFF and TORC.
Raked out cement pointing and re pointed using weather struck technique to match original.
Concrete parapet, cornice and door frames were reinforced with steel where possible. All significant cracks were opened up to remove corroding iron armature and repaired with stainless steel. Once all crack stitch repairs were complete the concrete fabric was repaired and replicated the decorative concrete detail on the parapet and door surrounds.
Matching salvaged bricks were used to re build damaged brick details around the windows.
The iconic canopy was restored and covered with rheinzink metal.
Famous landmark details
Other restoration works included the removal of all rain water goods, which were restored and refitted in the original cast iron. Later added aluminium drainpipes were replaced with re produced cast iron pipes.
All doors and window frames were replaced with new hardwood to replicate the original.
The string course and parapet wall was finished off with new lead detailing using traditional methods.
Dublin crest restored
And finally, the jewel in the crown was the restoration of the Dublin Crest on the parapet wall, the detail of which had been lost over the years. This was gently cleaned using the targeted TORC system. The TORC cleaning system is a stone conservation cleaning system used for the removal of more stubborn carbon staining as well as paint and plaster residue. Once cleaned, our skilled craftsmen carried out repairs to the plaque, reinstating the original engravings. Once the detail was revealed, the plaque was treated to a mineral wash to match the colour detail of the string course and to protect it from the elements for years to come.
Heritage Contractors
Our legacy is quality projects we can be proud of. We value the inputs of our customers, our team and our supply chain in reaching positive outcomes. Health and safety to our people and the public is a priority for us and without compromise.
If you are working on a similar project we would love to hear about it. Don’t hesitate to call us or send in the details of your project through our contact page at https://pmac.ie/contact-pmac/
PMAC is a registered Heritage Contractor and a link for the site can be found below.